BEIJING--June 9, 2008--Researched by Industrial Info Resources (Sugar Land, Texas)--The maximum load of the quake-hit Sichuan grid reached 13.21 million kilowatts (kW) on June 5, 2008, the State Electricity Regulatory Commission (SERC) announced. Before the major disaster, the grid's maximum load on May 12, 2008, was 13.01 million kW.

-